Infrastructure Renovation / Retrofit and Systems Upgrade

Replacement of an obsolete UPS system in an operating Tier III facility. Schweiger provided design assistance, pre-construction services and managed the build-out of new UPS and mechanical rooms, load transfer to the new UPS system, decommissioning, demolition and removal of the obsolete system. No unplanned interruptions of the facility were experienced during the project. Extensive methods of procedure (MOPs) were developed and executed.

Project Scope

  • Recondition and install (2) 300 kva UPS modules and (1) Static Bypass Module
  • (2) 18 ton Environment Air Conditioners and (1) 9 ton Make-Up Air unit with associated ductwork and controls
  • New feeders to all existing PDU’s served by the existing UPS System
  • New pre-action sprinkler system
  • (2) new automatic transfer switches on the main and generator power
  • New electrical panels, battery cabinets, spill containment, battery monitoring system and remote alarm controls
  • Demolition and removal of existing UPS System and batteries from basement (limited / difficult access)